MODERN DEMOLISHERS', BANGALORE, INDIA.
Our Safety Procedure includes:
- Risk Assessments
- Pre-Planning
- Site Safety
- Fall Protection
- Chutes
- Lift Boxes
- Removing Glass
- First Aid
- Adjoining Buildings
- Asbestos removal
- Task Sequences
- Site Clean Up and more
- Risk Ratings
Our Site Safety & Security
- Warning signs will be erected and checked each day.
Example “Warning Demolition Work in Progress”.
-
- Traffic control, road closures and pedestrian controls will be provided as identified and where required.
-
- Perimeter hoarding fencing will be installed as required.
-
- Gates will be locked at completion of the workday.
|
General Demolition Safety Information:
Demolition Work can be extremely dangerous and this Safe Work Procedure or Work Method Statement is a vital part of a safe work system.
Demolition Work Safety Notes
Before Commencing Demolition Work:
We Ensure :
Development approval has been granted.
Approval has been granted from the owner to proceed.
Building owner has provided a building report of any contained asbestos materials.
We Review:
Existing plans (if available) to identify structural systems. If plans are not available consult with a structural engineer.
Identify the plant and equipment to be used.
We Identify:
Safe means of access and egress to the site and for adjoining buildings and areas such as common use parks.
Any possible environmental impacts from the demolition.
QUICK, SAFE & HASSLE FREE DEMOLITION/DISMANTLING BY MODERN DEMOLISHERS (MODERN DISMANTLERS) BANGALORE.
'DEMOLITION ON TIME, EVERYTIME'
|